Dasović, B., Galić, M. & Klanšek, U. (2019). Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations. Buildings, 9. (1). doi: 10.3390/buildings9010021
Dasović, Borna, et al. "Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations." Buildings, vol. 9, no. 1, 2019. https://doi.org/10.3390/buildings9010021
Dasović, Borna, Mario Galić and Uroš Klanšek. "Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations." Buildings 9, no. 1 (2019). https://doi.org/10.3390/buildings9010021
Dasović, B., Galić, M. and Klanšek, U. (2019) 'Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations', Buildings, 9(1). doi: 10.3390/buildings9010021
Dasović B, Galić M, Klanšek U. Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations. Buildings [Internet]. 2019 [cited 2025 January 16];9(1). doi: 10.3390/buildings9010021
B. Dasović, M. Galić and U. Klanšek, "Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations", Buildings, vol. 9, no. 1, 2019. [Online]. Available at: https://urn.nsk.hr/urn:nbn:hr:133:567082. [Accessed: 16 January 2025]