Scientific paper - Original scientific paper
Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations
Buildings, 9 (2019), 1; 21. https://doi.org/10.3390/buildings9010021

Dasović, Borna; Galić, Mario; Klanšek, Uroš

Institutional repository: Repository GrAFOS

Cite this document

Dasović, B., Galić, M. & Klanšek, U. (2019). Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations. Buildings, 9. (1). doi: 10.3390/buildings9010021

Dasović, Borna, et al. "Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations." Buildings, vol. 9, no. 1, 2019. https://doi.org/10.3390/buildings9010021

Dasović, Borna, Mario Galić and Uroš Klanšek. "Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations." Buildings 9, no. 1 (2019). https://doi.org/10.3390/buildings9010021

Dasović, B., Galić, M. and Klanšek, U. (2019) 'Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations', Buildings, 9(1). doi: 10.3390/buildings9010021

Dasović B, Galić M, Klanšek U. Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations. Buildings [Internet]. 2019 [cited 2025 January 16];9(1). doi: 10.3390/buildings9010021

B. Dasović, M. Galić and U. Klanšek, "Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations", Buildings, vol. 9, no. 1, 2019. [Online]. Available at: https://urn.nsk.hr/urn:nbn:hr:133:567082. [Accessed: 16 January 2025]