Naslov Optimizacija vodoopskrbe Istre
Naslov (engleski) Optimization of Istria's Water Supply
Autor Melisa Fabijančić
Mentor Lidija Runko Luttenberger (mentor)
Član povjerenstva Marko Maliković (predsjednik povjerenstva)
Član povjerenstva Lidija Runko Luttenberger (član povjerenstva)
Član povjerenstva Goran Salopek (član povjerenstva)
Ustanova koja je dodijelila akademski / stručni stupanj Sveučilište u Rijeci Filozofski fakultet (Odsjek za politehniku) Rijeka
Datum i država obrane 2018-09-26, Hrvatska
Znanstveno / umjetničko područje, polje i grana TEHNIČKE ZNANOSTI Temeljne tehničke znanosti
Sažetak Tema ovog završnog rada je optimizacija vodoopskrbe Istre. Vodoopskrba Istre započela je početkom dvadesetog stoljeća kada su se počeli graditi lokalni vodovodi u gradovima. Prije toga, život Istrijana nije bilo lak, borili su se sa nestašicom vode i morali snalaziti kako bi prikupili koju kap vode skupljajući kišnicu. Osim toga obilazili su i obližnje izvore, a nakon toga gradili cisterne i korita. To ih je navelo na gradnju vodovoda. Planovi za gradnju istarskog vodovoda krenuli su 1924. godine prema projektu Gina Veronesea, da bi gradnja započela 1930. godine. Sama izgradnja Istarskog vodovoda trajala je jako dugo zbog ratnih zbivanja te problema prilikom izgradnje. Godine 1934. vodovod je službeno otvoren u Buzetu. Tvrtka Istarski vodovod d.o.o. djeluje i danas kao trgovačko društvo za proizvodnju i distribuciju vode. Nalazi se u Buzetu, a isporučuje vodu u sedam gradova te dvadeset i jednu općinu diljem županije Istarske. Isporuka vode vrši se sa četiri izvora iz kojih najveći kapacitet imaju izvori Butoniga i Gradole. Međutim, razvoj turizma i velikih vrućina ljeti dovodi do enormne potrošnje vode i suša što znači nedostatak vode u ljetnim mjesecima, a kako bi se to spriječilo u radu su navedena određena poboljšanja. Kako svi vodovodi u Istri nisu međusobno spojeni idealno rješenje bilo bi spojiti sve pojedinačne vodovode u jednu cjelinu. Osim toga, jedno od rješenja bilo bi sakupljanje kišnice u cisterne i bunare. Također, smanjenje potrošnje vode moguće je uz smanjenje dovoda pitke vode za ispiranja toaleta, a toalet se može koristiti i na način vakuumskog usisavača. Odlično rješenje je uvođenje dvostrukih vodoopskrbnih sustava kod kojih je jedan izvor pitka voda, a drugi nepitka voda.
Sažetak (engleski) The topic of this bachelor's thesis is optimization of Istria's water supply which originates from the beginning of 20th century, at the time when building of local water systems. Before that, the life of Istrian people wasn't easy. They were struggling with a lack of water so they were obliged to collect the rainwater. Beside that, they went to nearby wells and later on started to build tanks and troughs that led them to build the first water supply systems. The plans for constructing Istrian water supply system date from 1924 according to the project of Gino Veronese, and the construction itself started in 1930. The construction lasted very long because of the war and some major problems during construction. In 1934 water system was finally completed and officially opened in a small town of Buzet. Today, the company Istarski vodovod d.o.o. which is located in Buzet produces and distributes water to seven cities and twenty one municipality in Istria. Water delivery is made from four wellsprings, the biggest capacity being that of wells Butoniga and Gradole. However, growth of tourism and big heat waves negatively affect water supply so drought and a excessive consumption of water are very common. To prevent that, some improvements are proposed hereine. First of all, all, separate water supply systems in Istria should be integrated. Also, one of the solutions would be collecting the rain in tanks and wells. Reduction of potable water consumption for rinsing the toilette and using vacuum system would contribute to water saving. An excellent solution is introducing double water supply in with one coming from the wellspring of water and the other from rainwater or recycled water.
Ključne riječi
voda
vodoopskrba Istre
Istarski vodovod
problem vodoopskrbe
optimizacija vodoopskrbe
odvodnja
Ključne riječi (engleski)
water
Istria’s water supply
Istrian water supply utility
the problem of water supply
optimization of water supply
sewerage
Jezik hrvatski
URN:NBN urn:nbn:hr:186:675915
Studijski program Naziv: Politehnika Vrsta studija: sveučilišni Stupanj studija: preddiplomski Akademski / stručni naziv: sveučilišni/a prvostupnik/ prvostupnica (baccalaureus/baccalaurea) inženjer/inženjerka politehnike (univ. bacc. ing. polytechn.)
Vrsta resursa Tekst
Način izrade datoteke Izvorno digitalna
Prava pristupa Otvoreni pristup
Uvjeti korištenja
Datum i vrijeme pohrane 2018-10-24 09:41:09